West Michigan Paving Projects by Lite Load Asphalt

You can count on Lite Load Asphalt LLC for Any of Your Michigan Paving Projects!

Take a look at some of our past Michigan paving and asphalt projects to see the quality results you can expect from Lite Load. We serve the Grand Rapids metro area as well as other West Michigan communities, including Zeeland, Holland, Muskegon, Spring Lake, and Kalamazoo.

 

Check Out Our Paving & Asphalt Services to See If We Can Help With Your Next Project! 

Medical Mile

Medical Mile asphalt installation

Full Depth Paving

  • Full depth paving of 6-inches using special mix in 3 lifts 
  • Flag / Cone / Maintain city traffic while operating 
  • Keep McDonald’s access at all times due to contract 
  • Stripe road after completion 
  • Time: 2 Days 
  • Size: 40,000 SF 

Eberhard Center Parking Lot

Michigan Paving Projects

Maintain Stringent Needs of GVSU Campus

  • Mill 1.5-Inches Depth
  • Prep Lot after Milling
  • Pave and stripe Lot After Milling
  • Time: 2 days
  • Size: 45,000 sf

Holland State Park

Michigan Paving Projects

Fine Grade After Asphalt Tearout Lad 3″ Asphalt 

  • Pave 3” Asphalt in April while maintaining weather specs
  • Hit deadline of Campground being open on May 4
  • Prep roads in a timely manner so residents can access them daily
  • Time: 7 days
  • Size: 195,000 sf

City of Hudsonville

Michigan Paving Projects

Mill 1.5 Inches Depth Around Various City Roads 

  • Flag/Cone/Maintain city Traffic while operating
  • Keep Companies operational and maintain the flow of traffic
  • Prep roads in a timely manner so residents can access them daily
  • Time: 4 days
  • Size: 272,000 sf

Yanfeng Home Office Lot

Michigan Paving Projects

Mill/Removal of Existing Asphalt Full Depth 

  • Fine Grade Lot/Drive after Milling
  • Pave Lot 3” and 4” Depth
  • Stripe Lot
  • Perform while Site is still operational
  • Place signage in the lot
  • Time: 7 days
  • Size: 250,000 sf

Kenowa Hills Public Schools

Michigan Paving Projects

Fine Grade Asphalt Parking Areas 

  • Pave Parking Areas at 3.5-inches with spec material
  • Maintain Timeline for cure and lot usage
  • Stripe Lot After Paving
  • Maintain for no Waterholes
  • Time: 8 days
  • Size: 131,000 sf

Forest Hills Public Schools

Michigan Paving Projects

Mill and Remove Forest Hills Eastern Parking Lot

  • Pave Parking Areas with 4-inch special mix material
  • Maintain Timeline for cure and lot usage
  • Stripe Lot After Paving
  • Maintain for no Waterholes
  • Provided Value Engineering Saving Community $36,000
  • Time: 18 days
  • Size: 440,000 sf

The Meadow at GVSU

Michigan Paving Projects

Overlay of Golf Cart Areas 

  • Pave while maintaining Golf Course Integrity
  • Pave while golfers are golfing
  • Remove the Existing cart path and create a new path
  • Time: 1 day
  • Size: 50,000 sf

GVSU Student Housing

Michigan Paving Projects

Mill/Removal of Existing Asphalt to Partial Depth

  • Pave Lot including wedging
  • Stripe Lot
  • Place barricades down the middle of the lot
  • Place signage in the lot
  • Time: 7 days
  • Size: 382,000 sf

Allendale Public Schools

Allendale Track

Fine Grade Track After Asphalt Removal 

  • Pave Track 3 inches
  • Maintain Timeline for cure and track usage
  • Time: 4 days
  • Size: 40,000 sf